Echterhage Group: Chronicle + Milestones
 Location Neuenrade
|
 Location Gevelsberg
|
 Location Cantello
|
- 1984
Acquisition of a one-man steel tank construction operation through Jürgen Echterhage
- 1989
Formation of the company VSE Volumentechnik GmbH through Jürgen Echterhage and Axel Vedder. Development of flowmeters and electronic readouts
- 1990
Horst Echterhage joins the company and becomes Managing Partner of HBE GmbH. Extension of the product line to include hydraulic and drive technology components
- 1990
Relocation of both companies to the industrial area in Neuenrade-Küntrop
- 1994
Formation of the company ECOPLAN GmbH & Co. KG through Ruth Orthaus-Echterhage and Jürgen Echterhage
- 1997
Formation of a representative office of ECOPLAN in Dresden
- 1998
Acquisition of DST Dauermagnet-SystemTechnik GmbH in Hattingen along with associate partner Heinrich Wittschier
- 1999
Acquisition of Beinlich Pumpen GmbH in Velbert along with associate partner Jürgen Mauss
- 1999
Formation of a distribution company in Paris, France with Joint-Venture-partner Suco in Bietigheim-Bissingen
- 2000
Relocation of DST Dauermagnet-SystemTechnik GmbH to Neuenrade
- 2000
Formation of a representative office of ECOPLAN in Coesfeld
- 2000
Relocation of Beinlich Pumpen GmbH to a newly constructed production and administration facility in Gevelsberg
- 2001
Ruth Orthaus-Echterhage joins the marketing agency plakart as associate partner. Expansion of Plakart as a full-service agency for "advertising. communication. marketing"
- 2001
Relocation of Plakart to the industrial area in Neuenrade-Küntrop
- 2002
Relocation of DST Dauermagnet-SystemTechnik GmbH to the newly constructed production and administration facility in Neuenrade-Küntrop
- 2003
Acquisition of Oleotec S.r.l. in Varese, Italy
- 2003
Acquisition and formation of IC Flow Controls, Inc in Rossford, Ohio, USA
- 2003
Merger of ECOPLAN and Höne Immobilien in Coesfeld. New Managing Partner at ECOPLAN: Dipl.-Ing. Manfred Höne
- 2004
Formation of German Fluid Systems Co. Ltd. in China with Joint-Venture-partner Edward Lau from Hong Kong. Offices in hong Kong and Shanghai
- 2004
Formation of UK Flow Ltd. as a distribution company based in Liverpool, United Kingdom
- 2004
Formation of the compentence-network "CQ-Partner" through Plakart and Teamburg-Marketing in Kierspe together with other service providers and agencies
- 2004
Formation of an additional representative office for German Fluid Systems Co. Ltd. (GFS) in Guangzhou, an industrial centre in South China
- 2005
Relocation of Oleotec S.r.l. to new production and administration facilities in Cantello (Varese)
- 2005
Relocation of SucoVSE to a new administration and warehouse facilities in Creteil (near Paris)
- 2005
Formation of BEDA Flow Systems Pvt. Ltd. in India with Joint-Venture-partner Pradeep Das
- 2006
Oleotec S.r.l. doubled the production, warehouse, and office space in Cantello near the city of Varese in Italy. High pressure axial piston pumps from the British manufacturer Rotary Power were added to the product line offered.
- 2006
IC Flow Controls, Inc. moved their headquarters to Bloomington-Normal near Chicago, Illinois, USA. The new company building contains modern office spaces as well as extensive storage and service capabilities.
- 2006
At Hönnestraße 45 in Neuenrade, Germany, ground was broken for the new building, with a new location for the DST, plakart, ECO.PLAN, and Echterhage Holding companies as well as for VSE.
- 2006
DST was the first company to move into the production hall in the new building at Hönnestraße 45. Production in the new hall starts at the beginning of next year.
- 2007
Initial relocation of the VSE production to their new facilities in Hönnestr. 49; in June the administration followed.
- 2007
plakart is first to relocate to the new-built administration facility in Hönnestr. 45 – Now we are able to breathe again!
- 2007
The DST administration, ECO.PLAN and e.holding relocate to Hönnestr. 45.
- 2007
100% takeover of the Beinlich shares
- 2007
HBE takes over the renovated previous VSE office
- 2007
Inauguration of the e.lounge, our new communication centre in Hönnestr. 45. Family & Friends-Day at the Hönnestr. 45
- 2007
HBE takes over the renovated storage and staff rooms in Hönnestr. 51
- 2007
Formation of ECP.PLAST, PU and Plastic Parts as the European representative office of Pfeda, New Delhi. The registered office is in Neuenrade
- 2007
Completion of all building alterations and renovations
- 2008
HBE expands production and warehouse facilities at the Hönnestraße 51 in Neuenrade.
- 2008
Dipl.-Ing. (Graduate Engineer) Volkert Meinz becomes new Technical Manager of Beinlich Pumpen GmbH, Gevelsberg
- 2008
ECO.PLAN and e.holding inaugurate the "Mühlendorf" residential care home (offering assisted living), a project setting a new conceptual and architectural benchmark in the region.
|
Hydraulic Components
Flow Measurement
Permanent Magnetic Couplings
Special Pumps
Hydraulic Components
Building Construction. Planning
advertising. communication. marketing.
|
|